Dallas, Texas · Technology consulting since 202135 services · 3 practices · 8 industries Technology in ActionPartnerships888-624-6613
Research brief

In the cloud, identity is the blast radius

A review of four publicly documented cloud incidents shows the same pattern: the initial weakness varied, but the damage was determined by what a compromised identity was allowed to do. What that means for how cloud security is assessed.

Published
July 22, 2026
Reading time
11 minutes
Written by
EvrardBanes Cloud Security Practice
Looking up a glass curtain-wall tower into a bright sky

Network diagrams still dominate how many organizations think about cloud security: virtual networks, subnets, security groups and what is exposed to the internet. Those things matter. Read the public post-incident record of major cloud compromises, though, and a different picture emerges. The way in varies: a server-side request forgery, a stolen password, a forged token. The extent of the damage does not. It is set by the permissions of the identity the attacker obtained.

This brief reviews four publicly documented incidents, draws out the pattern they share and sets out what it means for how cloud security should be assessed. Every account here comes from the organizations’ own disclosures or official investigation reports.

Method and limits

We selected incidents with a detailed public account from the affected organization, its investigators or a government review body, and we stay within those accounts, including on impact. Four cases cannot establish frequencies. They can show mechanisms, and the mechanism here is consistent.

Four documented cases

1. Instance metadata to object storage (2019)

In the Capital One incident disclosed in July 2019, an attacker exploited a misconfigured web application firewall to perform server-side request forgery against the cloud instance metadata service, obtaining temporary credentials for the role attached to the instance. That role had permission to list and read storage buckets containing customer data. The application flaw was the entry point; the role’s broad storage permissions defined the scale. The incident contributed to the industry’s adoption of session-oriented metadata protections such as AWS IMDSv2.

2. Forged tokens from a signing key (2023)

The US Cyber Safety Review Board’s 2024 report on the Storm-0558 intrusion describes how an actor obtained a consumer-account signing key and used it to forge authentication tokens that were accepted for access to enterprise email. The review attributed the outcome to a cascade of security failures in key management and token validation. Here the compromised “identity” was the identity system itself: a key trusted to vouch for users.

3. A test tenant and an OAuth application (2024)

Microsoft disclosed in January 2024 that the actor it tracks as Midnight Blizzard used password spraying to compromise a legacy, non-production test tenant account without multifactor authentication. The actor then used an OAuth application with elevated access to reach the corporate environment, including senior staff mailboxes. A low-value account became high-impact because of what an application identity it could reach was permitted to do.

4. Credentials without a second factor (2024)

Mandiant’s June 2024 report on the campaign it tracks as UNC5537 describes the theft of data from customer instances of a cloud data platform using credentials previously harvested by infostealer malware. The affected accounts did not have multifactor authentication enabled, and some credentials had not been rotated for years. The platform itself was not breached; customer identities were.

CaseInitial weaknessWhat set the blast radius
2019 metadata SSRFApplication misconfiguration enabling SSRFBroad storage permissions on an instance role
2023 forged tokensCompromised signing key; token validation gapsBreadth of what tokens signed by that key were accepted for
2024 test tenantPassword spray on an account without MFAElevated permissions of a reachable OAuth application
2024 data platformStolen credentials, no MFA, no rotationData access granted to the compromised user accounts

The pattern

In each case, a security team that had perfectly configured network controls would still have been compromised, because the attack traveled through legitimate, authenticated interfaces. What determined the outcome was a set of identity questions:

  • What could this identity reach, and was all of it necessary?
  • Could this identity obtain or impersonate another, more powerful one?
  • Was the credential protected by a second factor, bound to a device or short-lived?
  • Would anyone have noticed the identity behaving unusually?
Network view versus identity view of the same cloud estate Network view Identity view Web subnetData subnetAdmin subnet allowed App role CI user All data s3:* on * assume-role
The same estate can look well segmented from a network perspective while every workload identity can reach every dataset. Assessments need both views.

Implications for assessment

Measure effective permissions, not attached policies

The question is not which policies are attached to an identity but what that identity can actually do once inheritance, group membership, resource policies, permission boundaries and role assumption are taken into account. Cloud providers offer tools that analyze effective and unused permissions; assessments should use them and then validate the results.

Map privilege-escalation paths

Many cloud privileges are indirectly powerful: the ability to pass a role to a new compute resource, update a function’s code, create access keys for another user or modify a trust policy. An identity holding one of these can often become a more powerful identity. Assessments should enumerate these paths, especially from identities exposed to the internet or to CI/CD systems.

Treat non-human identities as first-class

Workload roles, service principals, OAuth applications and CI/CD tokens commonly outnumber human users and are reviewed far less often. Several of the cases above turned on exactly these identities.

Look at the identity plane itself

Signing keys, federation trusts, tenant-level application consents and break-glass accounts are the crown jewels of a cloud estate. Their management deserves the scrutiny traditionally reserved for production databases.

Test detection as well as prevention

Ask whether unusual use of a powerful identity would be noticed: a role used from a new location, a sudden enumeration of storage, a new consent granted to an application. Detection is what turns an identity compromise from a breach into an incident.

Key takeaways

  1. Entry points vary; identity permissions set the damage.
  2. Assess effective permissions and escalation paths, not policy lists.
  3. Non-human identities (roles, service principals, OAuth apps and CI tokens) need the same rigor as people.
  4. Protect the identity plane: signing keys, federation and tenant-wide consents.
  5. Enforce MFA and credential hygiene everywhere a human authenticates, including test tenants and data platforms.

Sources

  • Capital One, public disclosures concerning the 2019 cybersecurity incident, July 2019.
  • Cyber Safety Review Board, Review of the Summer 2023 Microsoft Exchange Online Intrusion, 2024.
  • Microsoft Security Response Center, “Microsoft Actions Following Attack by Nation State Actor Midnight Blizzard”, January 2024.
  • Mandiant (Google Cloud), “UNC5537 Targets Snowflake Customer Instances for Data Theft and Extortion”, June 2024.

Our cloud security assessments map every identity path an attacker could take, then test the ones that matter. If you want to know your real blast radius before someone else measures it, talk to our cloud team.

Speak with an expert

Put this analysis to work on your environment.

Tell us what you are preparing for. A senior practitioner who has done this work will reply within one business day.