Dallas, Texas · Technology consulting since 202135 services · 3 practices · 8 industries Technology in ActionPartnerships888-624-6613
Cloud Security & Assurance

Know what your cloud actually exposes.

Cloud security engineering for AWS, Azure and Google Cloud. We test your estate the way an attacker and an auditor would, then build the guardrails, landing zones and fixes with your engineers, this sprint.

  • AWS
  • Microsoft Azure
  • Google Cloud
CUSTOMER-MANAGED · YOUR RESPONSIBILITY Identity Network Compute · K8s Data stores Logging Identity Network Compute · K8s Data stores Logging Identity Network Compute · K8s Data stores Logging federated identity SHARED RESPONSIBILITY BOUNDARY AWSAzureGoogle Cloud Provider-managed: facilities, hardware, hypervisor, core services
Who it is for
Cloud-first SaaS and regulated institutions
Coverage
AWS, Azure, Google Cloud, Kubernetes and IaC
Access model
Read-only, time-bound roles you create and revoke
You receive
Ranked findings, attack paths, remediation code and guardrails engineered with your team
The challenge

The provider secures the cloud. Everything you build in it is yours.

The decisions behind most cloud incidents sit on your side of the line: identity, exposure, logging and keys.

Posture tools raise thousands of alerts. They can’t tell you which three would let an attacker reach your payment data. We can.

A dashboard tells you what is misconfigured. An assessment tells you what an attacker could do with it.
Outcomes

What changes after an assessment

01

An inventory you can defend

Every account, cluster and data store mapped to an owner.

02

Least privilege, proven

Effective permissions analyzed across roles and federation.

03

Exposure ranked by attack path

Ordered by what can be reached and chained, not by scanner output.

04

Fixes in your engineers’ language

Terraform diffs, policies and guardrails that stop regressions.

Shared responsibility

Identity and data are always yours

The boundary moves with each service model. Assessors in every framework test the customer side of the line.

Who is responsible for each layer under IaaS, PaaS and SaaS
LayerIaaSPaaSSaaS
Facilities, hardware, hypervisorProviderProviderProvider
OS and runtime patchingYouProviderProvider
Network controlsYouSharedProvider
Service configurationYouYouShared
Identity and accessYouYouYou
Data protectionYouYouYou

Simplified. Each provider’s documentation defines the exact split.

ISO/IEC 27001 A.5.23

Use of cloud services

Acquire, use, manage and exit cloud services in line with your security requirements.

SOC 2 CC6.6

Boundary protection

Logical access measures against threats from outside the system boundary.

PCI DSS 1.3 · 10.5

CDE network controls & logs

Restricted traffic to cardholder data; logs retained for at least 12 months.

NIST SP 800-53 AC-6

Least privilege

Only the access each user and process needs, with no standing admin credentials.

Interactive demonstration

A multi-cloud assessment, in miniature.

A fictional payments company across three clouds. Filter findings, open the evidence and follow the attack paths that chain them together.

A simulation with synthetic data. Nothing connects to a real cloud account.

Multi-cloud security assessment
Simulated demonstration · synthetic data
Loading interactive demonstration…
Every asset, finding and score in this panel is synthetic and generated in your browser. Nothing is scanned, collected or sent.
Methodology

How we assess a cloud estate

  1. Phase 01

    Discover

    Landing zone, federation and the workloads that matter.

  2. Phase 02

    Assess

    Read-only analysis, architecture review and a permission graph.

  3. Phase 03

    Remediate

    Fixes sequenced by attack path, delivered as code.

  4. Phase 04

    Validate

    Retesting and an evidence pack for your frameworks.

  5. Phase 05

    Sustain

    Managed drift detection, guardrail tuning and ongoing cloud security engineering.

Posture tooling

“Bucket is public.”

EvrardBanes assessment

What the bucket holds, who relies on it, and the attack path it opens.

Capabilities & deliverables

What the service includes

Posture

Posture assessment

Every account and project, with each finding validated by a consultant.

Architecture

Landing-zone review

Account structure, segmentation and guardrail inheritance.

Identity

Entitlement review

Human and workload identities, analyzed as effective permissions.

Containers

Kubernetes security

EKS, AKS and GKE: RBAC, workload identity and admission control.

Code

Infrastructure-as-code review

Terraform, CloudFormation and Bicep, reviewed before deployment.

Testing

Cloud penetration testing

Run within each provider’s published testing policy.

Penetration testing
Accreditation & scope

One assessment, carried into every audit

What EvrardBanes delivers

  • Cloud security engineering: landing zones, guardrails and policy as code
  • Independent configuration and architecture assessment
  • Identity, Kubernetes and IaC review
  • Cloud penetration testing
  • Evidence packaged for audits and customer reviews

Where the evidence goes next

  • PCI DSS readiness and FedRAMP readiness, built on the same engineered controls
  • ISO/IEC 27001 certification audits and SOC 2 examinations, ready on day one
Framework mapping

One assessment, several audiences

Control areaCISISO/IEC 27001SOC 2PCI DSS v4.0.1NIST 800-53
Identity & least privilegeDirectly addressedDirectly addressedDirectly addressedDirectly addressedDirectly addressed
Network exposure & segmentationDirectly addressedDirectly addressedDirectly addressedDirectly addressedDirectly addressed
Data protection & encryptionPartially addressedDirectly addressedPartially addressedDirectly addressedDirectly addressed
Logging & retentionDirectly addressedDirectly addressedDirectly addressedDirectly addressedDirectly addressed
Cloud provider oversightNot addressed–Directly addressedDirectly addressedDirectly addressedDirectly addressed

Directly addressed    Partially addressed or different evidence expectations   , Not a primary objective. Mappings guide planning. Each framework’s own text is authoritative.

Industry considerations

Same providers, different obligations

Under DORA, cloud supporting critical functions needs a register entry, contractual terms and a tested exit strategy.

DORA readiness
Risks we test

The cloud risks we find most

Identity

Long-lived keys in pipelines

Static keys in CI variables, images and repos.

Identity

Over-trusting cross-account roles

A compromise elsewhere becomes a compromise here.

Exposure

Metadata credential theft

SSRF combined with permissive instance metadata.

Storage

Public snapshots & links

Production data copied outside the perimeter.

Kubernetes

Cluster-admin by default

One container becomes a cluster-wide incident.

AI workloads

Model endpoints & vector stores

Deployed fast, outside landing-zone guardrails.

Engagement journey

From scoping call to closed findings

  1. 01

    Scoping

    Accounts, frameworks and rules of engagement.

    OutputScope and access plan

  2. 02

    Access

    You deploy read-only roles from our templates.

    OutputVerified access

  3. 03

    Assessment

    Collection, validation and identity-path analysis.

    OutputDraft findings

  4. 04

    Workshop

    Attack paths walked through and owners assigned.

    OutputRemediation pack

  5. 05

    Retest

    Fixes verified and evidence packaged.

    OutputValidation report

FAQs

Questions teams ask

What access do you need?

Read-only roles that you create, scope and revoke, such as AWS SecurityAudit, Azure Reader and Security Reader, or Google Cloud Viewer. We supply the templates.

Will you change anything in our environment?

No. Configuration assessment is read-only. Active testing is agreed separately, under explicit rules of engagement.

We already have a CSPM tool. Why this?

Tools detect. An assessment adds validation, business context, identity paths and a plan your engineers can work through in order.

Do providers need to approve testing?

Not for configuration review. For penetration testing we follow each provider’s published policy and confirm it at scoping.

Can one assessment support several frameworks?

Yes. We organize the evidence for reuse and flag anything extra a particular framework needs.

Speak with an expert

Find out what your cloud really exposes.

Tell us your providers and the frameworks you answer to. A cloud specialist will come back with a proposed scope within one business day.