Dallas, Texas · Technology consulting since 202135 services · 3 practices · 8 industries Technology in ActionPartnerships888-624-6613
Adversarial assurance

Find the path, not just the flaws.

Scanners list weaknesses. Attackers chain them. We test the way a capable adversary would, and report what they could actually reach.

  • Web & API
  • Network
  • AWS · Azure · Google Cloud
EXTERNAL PERIMETER INTERNAL NETWORK APPLICATIONS · APIs CLOUD CONTROL PLANE 1Exposed login 2Weak session control 3Over-broad workload role FINDING · CHAINED 3 medium issues = 1 critical path
Who it is for
Leaders who need independent proof that their defenses hold
What we test
Applications, APIs, networks, cloud and segmentation
How we rate
CVSS v4.0, adjusted for your exposure and data
What you receive
Executive narrative, technical report and retest

A clean scan is not a safe system.

Serious breaches rarely need one critical flaw. They chain several ordinary ones: a verbose error, a permissive role, a forgotten endpoint.

Scanners cannot reason about business logic or reachability. Our testers can, working from your threat model under written rules of engagement.

Client outcomes

What a well-run test changes.

The value lies in the decisions made afterwards, not in the number of findings.

01

Demonstrated attack paths

Evidence of how an adversary moves from entry point to sensitive data.

02

Priorities teams accept

Ratings that combine CVSS v4.0 with real exposure and business context.

03

Evidence auditors recognize

Structured for PCI DSS 11.4, ISO/IEC 27001, SOC 2 and DORA.

04

Verified remediation

Retesting confirms the path is closed, not just masked.

Requirements

What the standards actually ask for.

Frameworks mean different things by “penetration test”. These requirements shape scope and frequency most often.

PCI DSS 11.4.1–11.4.3

Methodology, internal & external

A documented, industry-accepted method, with tests at least every 12 months and after significant change, by qualified, independent testers.

PCI DSS 11.4.4

Correct and retest

Exploitable findings are corrected in line with their risk ranking, then retested to verify the fix.

PCI DSS 11.4.5 · 11.4.6

Segmentation testing

Confirm CDE isolation annually and after change, or every six months for service providers.

DORA Art. 24–27

Resilience testing & TLPT

Annual testing of critical ICT systems, plus threat-led testing at least every three years for designated entities.

Interactive demonstration

Severity is a fact about your environment.

Adjust exposure, data sensitivity and exploit maturity to see why the same issue can warrant a different priority.

How we rate findings

We report a CVSS v4.0 vector for comparability, then a remediation priority based on what we demonstrated: reachability, data and chaining.

Finding priority in context
Simulated demonstration · synthetic data
Loading interactive demonstration…
Simplified scoring model applied to a fictional finding. It shows the reasoning behind our priorities rather than the CVSS v4.0 equations.
Methodology

Structured to repeat. Creative enough to matter.

Aligned with OWASP WSTG and ASVS, PCI SSC guidance and NIST SP 800-115, and driven by manual judgment.

  1. 01

    Scope

    Targets, windows, exclusions and stop conditions agreed in writing.

    OutputRules of engagement

  2. 02

    Threat model

    Map the attack surface from an adversary’s viewpoint.

    OutputPrioritized hypotheses

  3. 03

    Test & exploit

    Automated coverage plus manual testing. Exploitation stops at proof.

    OutputEvidence log

  4. 04

    Chain

    Combine weaknesses into realistic paths and assess impact.

    OutputAttack-path narratives

  5. 05

    Report & retest

    Debrief with owners, then retest fixes within the agreed window.

    OutputReport and retest letter

What we test

Every layer an attacker can reach.

Scoped together, so findings in one layer inform testing in the next.

01

Application & API

Authenticated, manual testing across every role, aimed at the authorization and business-logic flaws scanners cannot see.

  • Broken object- and function-level authorization
  • OAuth / OIDC flows, sessions and MFA bypass
  • Payment-page integrity (PCI DSS 6.4.3 · 11.6.1)
02

Network

External tests show what the internet can exploit. Internal tests assume a foothold and measure how far it travels.

  • Active Directory and Entra ID attack paths
  • Lateral movement and privilege escalation
  • PCI DSS segmentation from every out-of-scope segment
03

Cloud

Identity is the perimeter. We test what a stolen key or compromised workload could do in AWS, Azure and Google Cloud.

  • IAM escalation and cross-account trust
  • Kubernetes RBAC, pod security and escape
  • CI/CD and infrastructure-as-code trust boundaries
04

Red teaming & TLPT readiness

Objective-based exercises that test detection and response. For DORA-designated entities, we prepare scope and governance for a TIBER-aligned test.

  • Critical-function mapping and control-team set-up
  • Tester eligibility under DORA Art. 27 confirmed in writing

Configuration posture is covered by Cloud Security & Assurance, and clients often combine the two.

Framework mapping

One test, several obligations.

We scope around the most demanding requirement that applies to you.

Control areaPCI DSS v4.0.1ISO/IEC 27001:2022SOC 2 (TSC)DORA
Periodic external & internal testingDirectly addressedPartially addressedPartially addressedDirectly addressed
Testing after significant changeDirectly addressedPartially addressedPartially addressedPartially addressed
Segmentation / isolation validationDirectly addressedPartially addressedNot addressed–Partially addressed
Application security testingDirectly addressedDirectly addressedPartially addressedDirectly addressed
Remediation and retest evidenceDirectly addressedPartially addressedPartially addressedDirectly addressed
Threat-led red teamingNot addressed–Not addressed–Not addressed–Directly addressed

Directly addressed    Partially addressed or different evidence expectations   , Not a primary objective. ISO/IEC 27001 through Annex A 8.8 and 8.29, SOC 2 mainly through CC4.1 and CC7.1, and DORA through Articles 24–27.

Industry considerations

Same techniques. Different consequences.

We plan around change freezes and feed findings straight into your DORA testing program. DORA readiness →

Use cases

Where we are most often asked to look.

API

Broken object-level authorization

Changing an identifier returns another customer’s data.

Identity

Directory attack paths

A standard user reaches domain admin in a few steps.

Cloud

Workload role escalation

A compromised container uses its role to read secrets.

Payments

Payment-page script tampering

A third-party checkout script is altered to skim cards.

Segmentation

Leaky CDE boundaries

A monitoring agent quietly bridges into the CDE.

AI features

LLM-integrated applications

Prompt injection, unsafe tool use and cross-user leakage.

Deliverables

What you hold at the end.

Written for the executive who needs exposure, and the engineer who needs the fix.

Executive summary

Exposure and attack paths in plain language.

Technical findings

Evidence, CVSS v4.0, priority and specific fixes.

Attack-path narratives

Where each control could have stopped the attacker.

Findings register

CSV or JSON for your ticketing system.

Attestation of testing

Scope, dates and method, shareable without the findings.

Retest report

Closure evidence for PCI DSS 11.4.4 and your audit files.

Accreditation & scope

Who tests, and how the work stands up

What EvrardBanes delivers

  • Named senior testers, with qualifications listed in every proposal
  • Independent testing that meets PCI DSS 11.4 and FedRAMP guidance
  • TLPT readiness and testing for DORA-designated entities

Built into every engagement

  • Written authority for every target before testing starts
  • Third-party platforms tested with the provider’s permission
  • Threat intelligence sourced as TIBER-EU specifies
FAQs

Questions procurement and engineering ask.

How is a penetration test different from a vulnerability scan?

A scan finds known weaknesses at scale. A test confirms which are exploitable, finds the logic flaws scanners miss and chains issues into real paths. PCI DSS treats them separately, in 11.3 and 11.4.

Will testing disrupt production?

Not when it is planned properly. Rules of engagement set windows, rate limits, excluded techniques and stop conditions, and exploitation stops at proof.

How often should we test?

For PCI DSS, at least annually and after significant change, with six-monthly segmentation tests for service providers. Beyond compliance, time tests to your major releases.

Is retesting included?

Yes. Every proposal includes a retest of remediated findings within an agreed window, with an updated report.

Can we share the report with customers?

Share the attestation letter or the executive summary rather than the full technical report. We produce both as standard.

Can you perform DORA threat-led penetration testing?

Yes, for designated entities. TLPT follows Delegated Regulation (EU) 2025/1190 and TIBER-EU, and we confirm tester eligibility in writing before the engagement starts.

Scope a test

Tell us what an attacker would want. We’ll find the way in.

A senior tester will come back with a proposed scope, approach and rules of engagement, usually within one business day.