Austin, Texas · 14 weeksSOC 2 Type II Readiness for an HR PlatformMost delays are decided before testing starts: a boundary drawn too wide, cryptography that isn’t FIPS-validated, an inventory that drifts. We find those problems early, engineer the fixes and walk into your 3PAO assessment with a package that matches reality.
Every FedRAMP answer depends on where the boundary sits. Draw it too wide and corporate IT falls into scope. Draw it carelessly and your external services become findings.
None of this can be fixed in documentation. Run FedRAMP as an architecture project that happens to produce documents.
Shared corporate services pulled into scope.
Third parties handling federal data without authorization.
Modules that are not FIPS 140-validated.
Ephemeral infrastructure that never matches the inventory.
Findings that age without milestones.
The smallest scope that still captures every federal data path.
Cryptography, identity, logging and scanning fixed before formal testing.
An SSP your engineers recognize holds up in assessor interviews.
Scanning, inventory and POA&M discipline, month after month.
The Rev 5 control families that drive most engineering effort.
Every interconnection identified, risk-assessed and documented.
Validated modules in an approved mode, in transit and at rest.
Strong authentication for privileged and federal users.
Authenticated scans, container images included, reconciled to inventory every month.
Defined events, retention and alerting, with evidence that someone reviews them.
New in Rev 5: supplier assessment and component provenance.
A FIPS 199 categorizer. The highest impact rating across confidentiality, integrity and availability sets your baseline. Pick a profile or set the ratings yourself.
Categorization follows FIPS 199 and NIST SP 800-60 and is agreed with your agency sponsor. Baseline sizes are approximate.
We plan around the rules in force when you submit, and build evidence that works on either federal path.
The established route: an agency sponsor, the full Rev 5 baseline, a 3PAO assessment and an agency Authorization to Operate.
FedRAMP plans to modernize Rev5 over time. We confirm the rules in force at the start of every engagement.
Launched in 2025, 20x validates Key Security Indicators largely through machine-readable evidence rather than long narratives.
The 20x rules are still moving. We track every release so your evidence meets the version you submit against.
GovRAMP (formerly StateRAMP) gives state, local, tribal and education buyers one shared verification model, built on NIST SP 800-53 Rev 5.
GovRAMP sets its own statuses, security levels and fees. Most FedRAMP evidence carries straight across.
The provider owns the documentation, the 3PAO tests it and the agency accepts the risk. We sit on your side of that line, from the first diagram to the final SAR.
| Artifact | Purpose | Owner | EvrardBanes role |
|---|---|---|---|
| Readiness Assessment Report (RAR) | Proof the system is ready for authorization | 3PAO | Advisory: pre-assessment readiness review so the 3PAO finds nothing new |
| System Security Plan (SSP) | Boundary, architecture and how each control is implemented | Provider | Advisory: boundary design, implementation statements and responsibility matrix |
| SSP attachments | Policies, IR, contingency and configuration plans, inventory | Provider | Advisory: drafted to describe what your teams actually do |
| Security Assessment Plan & Report | Test plan, testing, findings and recommendation | 3PAO | Advisory: mock testing, evidence indexing and finding response |
| POA&M | Every open weakness with an owner and milestones | Provider | Advisory: process, deviation requests and monthly rhythm |
| Continuous monitoring | Monthly scans, inventory, annual assessment, change requests | Provider & 3PAO | Advisory: ConMon operations, change analysis and annual readiness |
FedRAMP keeps assessment and advisory apart. We prepare and engineer; an independent, A2LA-accredited 3PAO assesses. Agencies grant authorizations; GovRAMP grants GovRAMP statuses.
Our five-phase lifecycle, tuned for federal authorization.
Architecture, data flows, external services and a first categorization.
Gaps ranked by engineering effort and assessment risk.
Engineering sprints, with the SSP written as the work lands.
Readiness assessment, then formal testing and the SAR.
Monthly operations, annual assessment and significant-change support.
Every component, port and connection that will be tested.
Implementation statements written with your engineers.
Each module, its certificate and where it is enforced.
FedRAMP is an architecture project with a documentation output.
Never the other way round.
Most of the effort is reusable. Each program keeps its own scope and evidence rules.
| Control area | GovRAMP | CMMC / 800-171 | ISO/IEC 27001 | SOC 2 |
|---|---|---|---|---|
| Access control and identity (AC, IA) | Directly addressed | Directly addressed | Directly addressed | Directly addressed |
| Audit logging and monitoring (AU, SI-4) | Directly addressed | Directly addressed | Directly addressed | Directly addressed |
| Configuration management (CM) | Directly addressed | Directly addressed | Directly addressed | Partially addressed |
| FIPS 140-validated cryptography (SC-13) | Directly addressed | Directly addressed | Partially addressed | Not addressed– |
| Vulnerability scanning cadence (RA-5) | Directly addressed | Partially addressed | Partially addressed | Partially addressed |
| Continuous monitoring deliverables (CA-7) | Directly addressed | Not addressed– | Not addressed– | Not addressed– |
Directly addressed Partially addressed or different evidence expectations , Not a primary objective. CMMC has its own assessment rules, and cloud services that handle CUI need FedRAMP Moderate or equivalency as a separate requirement.
The most common applicants, and the most exposed to boundary sprawl. Many need a dedicated federal environment and a clear customer responsibility matrix.
Inherited controls, hardware supply chains and data provenance must be represented precisely. Agency buyers now ask about AI governance as well.
Cloud services that store CUI may need FedRAMP Moderate or equivalency on top of the contractor’s own CMMC obligations. We prepare both sides of that picture together, so one evidence set serves both.
State and local buyers increasingly ask for GovRAMP status. Much of it carries over from FedRAMP or ISO/IEC 27001 work.
Images scanned at build time and mapped to the running inventory.
Validated modules running in approved mode, end to end.
Inherited, shared and provider controls documented precisely.
Significant-change decisions that don’t slow delivery.
Architecture, sponsor and path.
OutputBoundary definition
Assessment against your baseline.
OutputRAR or sequenced roadmap
Remediation and package authoring.
OutputSSP and responsibility matrix
Formal 3PAO testing.
OutputSAP and SAR
Monthly rhythm and annual assessment.
OutputPOA&M and ConMon runbook
We are your readiness, engineering and advisory team. We design the boundary, close the engineering gaps, write the package with your engineers and rehearse the assessment, so your 3PAO tests a system that is already ready.
Yes, every week of the engagement if you want. FedRAMP keeps advisory and assessment independent, so we coordinate with the 3PAO you select and answer their questions with evidence, not narrative.
It depends on what the program accepts when you submit, on your sponsor and on how automated your evidence is. We build evidence that works for both and confirm the current rules at the start of every engagement.
On the Rev5 agency path, yes. The 20x path has its own entry requirements, and we walk you through the version in force.
Partly. FedRAMP adds FIPS-validated cryptography, a strict scanning cadence, inventory accuracy, federal incident reporting and monthly continuous monitoring.
No. GovRAMP serves state, local, tribal and education buyers with its own statuses. It builds on Rev 5, so FedRAMP work carries across.
Send us your architecture, target agencies and timeline. A senior practitioner will come back with a clear view of your boundary and the gaps that matter most.