Dallas, Texas · Technology consulting since 202135 services · 3 practices · 8 industries Technology in ActionPartnerships888-624-6613
Payment security · Core service

PCI DSS assessment that starts with the right scope.

A defensible cardholder data environment, every v4.0.1 gap closed and a Report on Compliance your acquirer accepts first time.

  • PCI DSS v4.0.1
  • ROC & SAQ
  • Merchants & service providers
CDE CONNECTED-TO · SECURITY-IMPACTING SEGMENTATION BOUNDARY OUT OF SCOPE •••• •••• •••• 4242 TOKEN tk_8Q2…F91 Payment API HSM Vault Identity SIEM Jump host Analytics (tokens) HR systems Corporate LAN
Who it serves
Merchants, processors, gateways, acquirers, issuers and SaaS platforms
Standard
PCI DSS v4.0.1, the only active version
Our role
Readiness, gap assessment, remediation and SAQ support from CISA- and CISM-certified practitioners
You receive
Scope rationale, gap assessment, roadmap, remediation support and an evidence index ready for your QSA
The business challenge

Compliance is no longer an annual event.

Assessors no longer ask whether a control was in place on the day. They ask whether it operated, at the frequency you chose, all year.

Since 31 March 2025 the future-dated requirements apply in full, and they are the hardest to evidence. A narrower, well-evidenced scope is the most effective way to cut both risk and cost.

Principal requirements
12
Future-dated controls in force since
2025
Months between scope checks for service providers
6
Payment-page script controls added
2
The most expensive mistakes in PCI DSS are scoping mistakes. Everything downstream inherits them.

What a well-run program gives you

01

A scope you can defend

Data flows, discovery results and segmentation evidence for every boundary.

02

No surprises at validation

Gaps found, fixed and retested months before fieldwork.

03

Evidence that runs itself

A calendar tied to your risk analyzes, so year two costs less.

04

Payment pages under control

Script inventory and tamper detection against e-skimming.

Requirements in focus

The v4.0.1 requirements that decide assessments.

The ones organizations underestimate, and what an assessor will ask to see.

Req. 12.5.2

Scope confirmed, not assumed

Confirmed every 12 months and after significant change; every 6 months for service providers.

What assessors look forDiagrams that match reality and a reason for every boundary.

Req. 12.3.1

Targeted risk analyzes

Where you choose a control’s frequency, a documented analysis must justify it.

What assessors look forA reasoned analysis for each requirement, never a template.

Req. 6.4.3

Payment-page scripts

Every script authorized, integrity-assured and inventoried with a justification.

What assessors look forA live inventory and the integrity mechanism in use.

Req. 11.6.1

Change and tamper detection

Unauthorised changes to payment pages and headers detected and alerted.

What assessors look forThe mechanism, alert routing and triaged alerts.

Req. 11.3.1.2

Authenticated scanning

Internal scans run with the privileges an attacker with a foothold would have.

What assessors look forCredentialed configuration and coverage reconciled to inventory.

Req. 8.4.2

MFA for all CDE access

Every non-console route into the CDE, including internal administrative access.

What assessors look forAuthentication flows for each path, including break-glass.

Choose the right validation route

Your acquirer or the card brands set the route. Your architecture decides SAQ eligibility.

RouteTypically suitsWhat to watch
SAQ AFully outsourced e-commerce payment pagesNew script-attack eligibility criterion
SAQ A-EPSites that affect payment-page security6.4.3 and 11.6.1 apply in full
SAQ B / C / P2PETerminals, payment applications, listed P2PEIsolation, hardening and listings
SAQ DEveryone else eligible to self-assessOften a sign scope can be reduced
Report on ComplianceHigher-volume merchants and service providersIssued by a QSA company

A guide only. Each SAQ, and your acquirer or payment brand, defines eligibility.

Interactive demonstration

Walk through a PCI DSS assessment.

Turn segmentation off and watch the scope grow. Then advance the evidence cycle, open the findings and read the board summary.

PCI DSS assessment workspace for Northwind Commerce, a fictional merchant
Simulated demonstration · synthetic data
Loading interactive demonstration…
Every asset, finding and score in this panel is synthetic and generated in your browser. Nothing is scanned, collected or sent.
Our methodology

Five phases, built around scope.

Every phase begins by asking whether the boundary still holds.

  1. Phase 01

    Discover

    Trace account data from capture to deletion; discover it where it should not be.

  2. Phase 02

    Assess

    Test every requirement against v4.0.1 procedures across the whole period.

  3. Phase 03

    Remediate

    Reduce scope first, then fix the controls hardest to evidence.

  4. Phase 04

    Validate

    Retest and index the evidence for formal validation.

  5. Phase 05

    Sustain

    Evidence calendar, quarterly scope checks and change reviews.

PCI DSS gap & readiness

A full rehearsal, before the verdict.

The right first step before a first v4.0.1 assessment, after an architecture change, or when you want to retire compensating controls.

Request a readiness assessment
01

Scope and segmentation baseline

Data-flow mapping and card-data discovery, settled before testing.

02

Requirement-level gap assessment

Each sub-requirement rated in place, partial or not in place.

03

Risk analyzes and customized approach

The 12.3.1 analyzes your frequencies depend on.

04

Remediation roadmap

Owners, acceptance criteria and a date you can share with your acquirer.

Capabilities

Everything a PCI program needs, one methodology.

One team from scoping to attestation, so findings and fixes stay aligned.

Assessment

Formal assessment readiness

Evidence prepared, indexed and rehearsed with your team before your QSA arrives.

Self-assessment

SAQ selection and completion

The right SAQ, with evidence behind every “yes” and an AOC ready to sign.

Scope

Card-data discovery

Finding account data in logs, tickets and backups, then designing it out with tokenization or P2PE.

Testing

Penetration and segmentation testing

Requirement 11.4 testing, including segmentation from every out-of-scope network.

Penetration testing
E-commerce

Payment-page script security

Inventories, integrity enforcement and tamper detection for 6.4.3 and 11.6.1.

Program

Service provider obligations

Responsibility matrices, executive accountability and six-monthly reviews.

Deliverables

What you will hold at the end

Scope document and data flows

Every flow and boundary, with its rationale.

Gap assessment

Status and evidence gap per sub-requirement.

Targeted risk analyzes

Ready for annual review.

Remediation roadmap

Owners, criteria and retest dates.

Evidence index

Mapped to testing procedures.

Executive summary

Scope, readiness and decisions required.

Framework mapping

Where PCI work also serves other obligations.

Map once, and record every difference in scope and frequency.

Control areaISO/IEC 27001:2022SOC 2NIST CSF 2.0DORA
Segmentation & firewalls (Req. 1)Directly addressedDirectly addressedDirectly addressedPartially addressed
Stored account data (Req. 3)Partially addressedPartially addressedPartially addressedPartially addressed
Secure development & scripts (Req. 6)Directly addressedPartially addressedPartially addressedNot addressed–
MFA & access control (Req. 7–8)Directly addressedDirectly addressedDirectly addressedDirectly addressed
Logging & review (Req. 10)Directly addressedDirectly addressedDirectly addressedDirectly addressed
Scanning & penetration testing (Req. 11)Directly addressedPartially addressedDirectly addressedDirectly addressed

Directly addressed    Partially addressed or different evidence expectations   , Not a primary objective. PCI DSS evidence is scoped to the CDE; other frameworks may require the control across a wider estate.

One evidence model across frameworks

Industry considerations

Same standard. Different environments.

Terminals, web, apps and contact centers: each channel carries its own scope.

  • Script control on checkout, including tag managers
  • Terminal inventories and tamper inspection
  • Retail & e-commerce
Technologies & risks

Where card data is attacked, and how scope shrinks.

Threat

E-skimming

Malicious JavaScript copies card data as it is typed. It is the reason 6.4.3 and 11.6.1 exist.

Scope reduction

Tokenization

Keeps analytics, CRM and support tools out of scope when detokenisation is restricted.

Scope reduction

Point-to-point encryption

A listed P2PE solution encrypts in the terminal and shrinks the merchant’s scope.

Architecture

Cloud-native CDEs

Namespaces, meshes and serverless need their own segmentation evidence.

Engagement journey

From first call to Attestation.

A typical first year. Later years compress the early stages.

  1. 01

    Scoping call

    Channels, volumes and validation level.

    OutputProposal

  2. 02

    Discovery

    Data-flow workshops and card-data discovery.

    OutputScope document

  3. 03

    Gap assessment

    Testing against v4.0.1 procedures.

    OutputWorkbook and roadmap

  4. 04

    Remediation

    Working sessions and retests.

    OutputClosed findings

  5. 05

    Validation

    ROC or SAQ validation.

    OutputAOC

Accreditation & scope

What you get from one firm

What EvrardBanes delivers

  • Readiness and remediation that carry you to a clean ROC with your QSA
  • External scan readiness and dispute evidence
  • Readiness, gap assessment and SAQ support
  • Scoping, card-data discovery, penetration and segmentation testing

Across the wider PCI family

  • P2PE, PIN, 3DS, SSF and card production readiness, prepared for the specialist assessment each standard requires

Every proposal sets out the deliverables, the team and the dates before work begins.

FAQs

Questions we are asked.

Do we need a Report on Compliance or can we self-assess?

Your acquirer (for merchants) or the payment brands (for service providers) decide, usually by volume and risk. Start with their written requirement, and we will confirm which SAQ, if any, you are eligible for.

Who signs our Report on Compliance?

Your ROC is signed by an independent QSA company. We take you from scoping to a fieldwork-ready evidence pack, so the assessment confirms what you already know.

What is the customized approach?

It lets you meet a requirement’s objective with a different control, backed by a controls matrix and a targeted risk analysis. It suits mature organizations. It is not a shortcut around a hard requirement.

How does segmentation reduce scope?

Tested segmentation shows out-of-scope networks cannot reach the CDE. Testing is required at least annually for merchants and every six months for service providers.

We use a provider’s hosted form. Do 6.4.3 and 11.6.1 apply?

For SAQ A they were replaced by an eligibility criterion in January 2025. For SAQ A-EP, SAQ D and ROCs they apply in full. Read our analysis.

Can the team that helps us remediate also assess us?

Yes. Readiness and assessment run as separate workstreams, so the advice you act on and the report you receive both stand up to scrutiny.

Speak with a PCI expert

Bring us your scope. We’ll show you what we see.

Share your payment channels and validation requirement. A senior practitioner will reply with a first view of your scope, usually within one business day.