Independent project controls · Dallas · Since 2021

Projects fail in the forecast first.

We measure what matters to keep your project on track. We stress-test the schedule, validate progress and flag the slip before it becomes a delay, so leadership decides on data it can defend.

Program pulseSample
SPI
0.97
CPI
1.03
P80 buffer
21d
Design release
Long-lead equipment
Structure
MEP and fit-out
Commission and open
Critical path · 3 of 5 activitiesData date
Who we are

We stress-test the logic, measure the progress and put the real date in front of leadership while it can still be changed.

20 yrs
Founder delivering programs
2021
Founded
16
Services
16
Markets served

We do not pour concrete, design buildings or sell software. We are the independent eyes on time and cost, working for owners, builders, lenders and counsel who need the truth early.

About EvrardBanes
What we do

Sixteen services. One version of the truth.

Plan, control, recover, and the construction IT that holds the numbers together. Call us before the first activity is drawn, or the week the dates stop holding.

Controls Lab · Live

Price a late day before it happens.

Set the sliders to your project. Most teams have never seen this number written down. Then build and break a real CPM schedule in Schedule Studio.

Open Schedule Studio
Every day late costs about$0
One week
One month
A 90-day slip
Featured projects

The record, not the brochure.

40 confidential projects across four sectors. The owners stay private. The dates, the logic and the outcomes do not.

$980MHealthcare Regional Medical Center Replacement HospitalA whole hospital moves on one day. Every system, every bed and every patient transfer points at that date. U.S. Texas690,000 SF · 320 beds52 monthsFinishing 2027$760MWater & Wastewater Deep Tunnel Stormwater StorageFive miles of tunnel, two hundred feet down, built so a city stops flooding when it rains. U.S. Midwest & Mountain5.2 miles · 28 ft bore56 monthsFinishing 2027$720MData Centers Multi-Tenant Colocation Data CenterTenants signed for megawatts on dates. Every hall was energized and handed over on the day it was sold. U.S. Texas4 data halls · 36 MW30 monthsCompleted 2025$1.65BData Centers Powered Shell & Data Hall Fit-Out ProgramSix buildings, one rhythm. Each data hall comes online faster than the one before it. U.S. Midwest & Mountain6 buildings · 240 MW34 monthsFinishing 2026$1.45BTransportation Managed Express Lanes CorridorTwenty-two miles of new lanes beside traffic that never stops. Every traffic switch is planned to the night. U.S. Texas22 miles · 31 bridges58 monthsFinishing 2027$1.1BSports & Entertainment Retractable Roof BallparkOpening day is printed on the tickets. A moving roof and forty-two thousand seats are being built backward from it. U.S. Southeast42,000 seats42 monthsFinishing 2027$390MPower & Renewables Onshore Wind Farm RepoweringEighty-six turbines rebuilt to catch more wind. Tax credit dates were met with weeks to spare. U.S. Midwest & Mountain86 turbines · 300 MW18 monthsCompleted 2024$560MPower & Renewables 345 kV Transmission Line & SubstationsOne hundred forty miles of steel and wire, carrying power to the data centers and towns that were waiting for it. U.S. Texas140 miles · 3 substations36 monthsCompleted 2025
Program Rates

The second data hall should cost less.

The next data hall, the next substation, another school in the same bond program. The WBS, logic library, cost codes, risk register and report templates already exist and already work. The same team returns at a highly discounted Program Rate, so you pay for the setup once.

Project 1Full setupBuilt once
Project 2Program RateReused
Project 3Program RateReused
Project 4Program RateReused
Setup: WBS, logic, codes, templatesOngoing controls
Markets

Sixteen markets where a day has a price.

Buildings, advanced industry, infrastructure and energy. Different trades, the same question: is the finish date real?

Lola Osoba, Founder of EvrardBanesLola OsobaFounder · 20 years delivering complex programs
Why this firm exists

I founded EvrardBanes as a dedicated Project Controls firm because most projects don’t fail in the field. They fail in the forecast.

Talk to a scheduler

Find the slip while it is small.

Send the schedule, the budget and the date your board is counting on. A senior project controls lead replies within one business day.