Dallas, Texas · Technology consulting since 202135 services · 3 practices · 8 industries Technology in ActionPartnerships888-624-6613
Trust services assurance

SOC 2 that answers the security review before it is sent.

The right criteria in scope, controls that fit how your engineers already work, and evidence your auditor can test without weeks of back-and-forth.

  • AICPA Trust Services Criteria
  • AT-C 205
  • Type 1 → Type 2
CC1CC2CC3CC4CC5CC6CC7CC8CC9 Security COMMON CRITERIA Availability Confidentiality Processing integrity Privacy
Who it is for
SaaS, cloud, data and AI companies selling to enterprise buyers
Report readers
Customers’ security, risk and procurement teams
Our role
Scoping, readiness, control design, evidence and audit management
The outcome
A clean Type 2 report that shortens every security review
The business challenge

The deal is waiting on a report.

SOC 2 usually arrives as a sales problem: a prospect will not sign without one. The urgency tempts companies to copy a template written for someone else’s architecture.

We start from your buyers’ questions and your production reality. Then we design the leanest control set that meets the criteria and survives testing.

Trust Services Categories, with Security always required
5 categories
Common criteria series, CC1 to CC9
9 series
Typical Type 2 observation period, agreed with your auditor
3–12 months
Client outcomes

What good readiness delivers.

01

Deliberate scope

Categories and boundaries that match what customers actually ask.

02

Controls engineers accept

Built into SSO, pull requests and infrastructure as code.

03

Evidence by default

Recurring controls produce their own tickets, logs and exports.

04

Reuse beyond SOC 2

One control set ready for ISO/IEC 27001 and questionnaires.

Interactive explorer

Build your Trust Services scope.

Security (CC1–CC9) is always in scope. Add categories to see how the criteria and the evidence burden grow.

Include a category only when customers rely on it contractually.

Follows the AICPA 2017 Trust Services Criteria (revised points of focus, 2022). Summaries are ours; the AICPA text governs.

Type 1 vs Type 2

Two reports, two questions.

Type 1: is the design right on one date? Type 2: did controls operate across a period? Buyers ultimately want Type 2.

6 months

Our methodology

Readiness built on production reality.

We test your environment the way your auditor will, so the examination confirms what we already know.

  1. Discover

    Map the system

    Infrastructure, data flows, vendors and customer commitments.

  2. Assess

    Criteria gaps

    Inspect live configurations, not questionnaire answers.

  3. Remediate

    Design controls

    Control set, policies, runbooks and evidence capture.

  4. Validate

    Mock audit

    Sample-test, finalize the description, brief the CPA firm.

  5. Sustain

    Operate the period

    Evidence calendar and monthly control health checks.

Your first Type 2 should record normal operations, not a quarter of heroics.
Deliverables

What you keep.

Scope & category decision

System boundary and categories, with the reasoning.

Criteria-level readiness report

Controls, gaps, evidence status and remediation per criterion.

Control matrix

Controls mapped to criteria, owners, tooling and evidence.

Policy & procedure set

Concise policies your teams will actually follow.

System description draft

Infrastructure, people, data, CUECs and subservice organizations.

Evidence calendar & auditor pack

Recurring evidence schedule and a ready request-list response.

Accreditation & scope

From readiness to a signed report

What EvrardBanes delivers

  • SOC 2 scoping, readiness and gap remediation
  • Control, policy and technical implementation guidance
  • Evidence preparation, mock audit and description drafting
  • CPA firm selection and management of fieldwork

What completes the report

  • The SOC 2 examination and opinion, signed by the licensed CPA firm you appoint (AT-C 205)
  • International equivalents such as ISAE 3000 reports, issued by qualified assurance practitioners
Framework mapping

How SOC 2 controls carry over.

One unified control set cuts duplicated effort. Each framework still receives the evidence it asks for.

Control areaSOC 2ISO/IEC 27001PCI DSSISO/IEC 42001HITRUST CSF
Access control & reviews (CC6)Directly addressedDirectly addressedDirectly addressedPartially addressedDirectly addressed
Change management (CC8)Directly addressedDirectly addressedDirectly addressedPartially addressedDirectly addressed
Risk assessment (CC3)Directly addressedDirectly addressedPartially addressedDirectly addressedDirectly addressed
Monitoring & incident response (CC7)Directly addressedDirectly addressedDirectly addressedPartially addressedDirectly addressed
Vendor management (CC9)Directly addressedDirectly addressedDirectly addressedPartially addressedDirectly addressed
AI system impact assessmentNot addressed–Not addressed–Not addressed–Directly addressedPartially addressed

Directly addressed    Partially addressed or different evidence expectations   , Not a primary objective. Mappings guide planning. Each framework’s own text is authoritative.

Industry considerations

What different buyers read for.

Procurement reads the description, exceptions and CUECs, then probes tenant isolation, data deletion and staff admin access.

Technical risks

Where readiness stumbles.

Identity

Accounts outside SSO

Local console and database accounts missing from access reviews.

Pipelines

Direct pushes to production

Admin bypass on branch protection undermines change evidence.

Logging

Alerts nobody owns

Detections routed to a channel with no on-call response.

Vendors

Unreviewed subprocessors

Model and API providers without a documented assurance review.

Engagement journey

From kick-off to your first Type 2.

  1. 01

    Scope

    Categories, boundary and timeline.

    OutputScope memo

  2. 02

    Readiness

    Criteria-level assessment.

    OutputReadiness roadmap

  3. 03

    Build

    Controls and evidence capture.

    OutputControl matrix & policies

  4. 04

    Type 1 / mock

    Design confirmed; auditor engaged.

    OutputType 1 or mock results

  5. 05

    Type 2

    Normal operations, then fieldwork.

    OutputSigned Type 2 report

FAQ

What founders and CISOs ask.

Is SOC 2 a certification?

No. It is an attestation report: a licensed CPA firm’s opinion on your controls. We prepare you for it and stay with you through fieldwork.

Which categories should we include?

Security is required. Add Availability, Confidentiality, Processing Integrity or Privacy only when customers rely on them.

How long until a Type 2 report?

Readiness, then an observation period of commonly three to twelve months, then fieldwork. We commit to a firm date once the readiness assessment is complete.

Do automation platforms replace readiness?

They collect evidence. They do not set scope, design controls for your architecture or fix gaps. We work with any platform, or none.

What is a bridge letter?

A management letter covering the gap since your last report period. Customers accept it for short gaps; it is not audit evidence.

Speak with an expert

Turn the security review into a formality.

Share your architecture, your buyers’ requirements and your target date. We will map the fastest credible route to a clean report.