Dallas, Texas · Technology consulting since 202135 services · 3 practices · 8 industries Technology in ActionPartnerships888-624-6613
Multi-Framework Compliance & Continuous Assurance

One control set. Many obligations.

A single control and evidence model that meets SOC 2, ISO/IEC 27001, PCI DSS, DORA and more on their own terms, and stays current between audits.

  • SOC 2 · ISO/IEC 27001
  • PCI DSS · DORA
  • NIST CSF 2.0 · HITRUST
Quarterly access review collected once SOC 2 CC6.3 ISO/IEC 27001 A.5.18 PCI DSS 7.2.4 DORA Art. 9(4)(c) NIST CSF 2.0 PR.AA-05
Who it is for
Organizations answering to two or more frameworks at once
The model
One control set and one evidence calendar, with framework-specific outputs
Our role
Control design, readiness, continuous assurance and audit management
The result
Fewer audit hours, fewer findings and one view of control health

Compliance debt compounds.

Adopt frameworks one at a time and your engineers end up answering the same access question in four formats.

We build one control set, designed to the strictest requirement that applies. Each control has one owner, one description and one evidence routine.

Overlap is real. Equivalence is not. The value lies in knowing exactly where one framework ends.
Outcomes

What a unified program gives you.

Fewer hours of audit preparation. Fewer findings.

01

One owner per control

Described, owned and tested once, with framework references attached.

02

Collect once

Evidence designed to the most demanding frequency and population.

03

A calendar you can plan

Evidence ready before fieldwork begins.

04

A board-level view

One view of control health, not five reports that disagree.

Requirements

Where frameworks genuinely differ.

These differences decide how a unified program must be designed.

SOC 2ISO/IEC 27001:2022PCI DSS v4.0.1NIST CSF 2.0DORA
What it isAttestation reportCertifiable management systemMandatory card-data standardVoluntary frameworkEU regulation
Who issues the outcomeLicensed CPA firmAccredited certification bodyQSA (ROC) or self-assessment (SAQ)No certificateSupervised by competent authorities
TimingPoint in time or review periodThree-year cycle, surveillance auditsAnnual, plus quarterly scansContinuousContinuous, with testing duties
PCI DSS 7.2.4

Six-monthly access reviews

Vendor accounts included, which gives SOC 2 and ISO a richer population too.

PCI DSS 11.3

Quarterly scanning

Internal authenticated scans and ASV external scans set the rhythm for every framework.

DORA Art. 28 · 30

Register and contract terms

Treat the register as the master provider inventory for every framework.

SOC 2 Type 2

Complete populations

Evidence must export from source systems, a discipline that strengthens every audit.

Interactive demonstration

One piece of evidence, five frameworks.

Choose an evidence item to see which requirements it supports, and what each framework demands on top.

Control-to-framework evidence map
Simulated demonstration · synthetic data
Loading interactive demonstration…
Every asset, finding and score in this panel is synthetic and generated in your browser. Nothing is scanned, collected or sent.
Continuous assurance

True between audits.

We run the evidence calendar with you, so audit season becomes a confirmation rather than a scramble.

Illustrative annual evidence calendar showing activities by month and the frameworks they support
ActivityJanFebMarAprMayJunJulAugSepOctNovDec
User access reviewSOC 2 · ISO · PCI · DORAYesYesYesYes
Internal & external vulnerability scansPCI (quarterly) · SOC 2 · ISO · DORAYesYesYesYes
Penetration testPCI (annual + significant change) · SOC 2 · ISO · DORAYes
Segmentation testPCI (six-monthly for service providers)YesYes
Incident response & continuity exercisePCI 12.10.2 · DORA Art. 11(6) · ISO · SOC 2Yes
Risk assessment & Statement of Applicability reviewISO · SOC 2 · PCI targeted risk analyzesYes
Third-party provider reviewsDORA register · PCI 12.8.4 · SOC 2 · ISOYesYesYesYesYesYesYesYesYesYesYesYes
ISMS management reviewISO/IEC 27001 clause 9.3YesYes
SOC 2 Type 2 review periodControls must operate throughout the period
ISO/IEC 27001 surveillance auditFieldwork
PCI DSS annual assessmentFieldwork

Illustrative calendar. Your cadence follows your own control descriptions, risk analyzes and assessment dates. Rolling dots mark activities spread across the year by provider criticality.

01

Calendar ownership

We chase owners and check every artifact before it is filed.

02

Quarterly health reviews

Exceptions surface months before fieldwork, while there is time to fix them.

03

Auditor liaison

One point of contact for your CPA firm, certification body and QSA.

04

Tool-agnostic

We work in the tools you already use. We don’t sell software.

Methodology

How we build one program.

Our five-phase lifecycle, applied to compliance.

  1. Phase 01

    Discover

    Every obligation, with its scope and timing.

  2. Phase 02

    Assess

    Controls rationalized and gaps mapped by framework.

  3. Phase 03

    Remediate

    Controls redesigned to the strictest requirement.

  4. Phase 04

    Validate

    Readiness testing before each formal audit.

  5. Phase 05

    Sustain

    Calendar operation and change review.

Capabilities & deliverables

What the service includes.

From a one-off rationalization to a retained program.

Strategy

Rationalization & sequencing

Which frameworks you need, in the order that reuses the most work.

  • Obligation inventory
  • Two-year assurance roadmap
Design

Unified control framework

One library with framework references, owners and testing attributes.

  • Controls an auditor can test
  • Statement of Applicability alignment
Evidence

Evidence model & calendar

What evidence, from which system, how often and who signs off.

  • Population completeness checks
  • Automation where tools allow
Readiness

Framework readiness

Mock testing against each framework before the formal event.

  • Mock sampling
  • Remediation plans
Coordination

Audit coordination

One program office for request lists, walkthroughs and evidence.

  • Shared request tracking
Retained

Continuous assurance

Controls operating and evidence current between audits.

  • Quarterly health reviews
  • Change-impact assessment
Accreditation & scope

One program office for every audit

What EvrardBanes delivers

  • Program design and evidence models
  • Readiness assessments against each framework
  • Continuous assurance and audit coordination

Formal assessments in-house

  • PCI DSS Reports on Compliance, from your QSA company
  • Quarterly external scans, from your Approved Scanning Vendor
  • FedRAMP assessments, from your 3PAO
  • CMMC Level 2 certification, from your C3PAO
Framework mapping

Control areas across six frameworks.

The starting point for a unified control set, read alongside each framework’s own text.

Control areaSOC 2ISO/IEC 27001PCI DSSNIST CSF 2.0DORAHITRUST CSF
Access controlDirectly addressedDirectly addressedDirectly addressedDirectly addressedDirectly addressedDirectly addressed
Vulnerability managementDirectly addressedDirectly addressedDirectly addressedDirectly addressedDirectly addressedDirectly addressed
Change managementDirectly addressedDirectly addressedDirectly addressedPartially addressedDirectly addressedDirectly addressed
Business continuity & resiliencePartially addressedDirectly addressedPartially addressedDirectly addressedDirectly addressedDirectly addressed
Cryptography & key managementPartially addressedDirectly addressedDirectly addressedPartially addressedDirectly addressedDirectly addressed
Secure developmentPartially addressedDirectly addressedDirectly addressedPartially addressedPartially addressedDirectly addressed
PrivacyPartially addressedPartially addressedNot addressed–Partially addressedNot addressed–Partially addressed

Directly addressed    Partially addressed or different evidence expectations   , Not a primary objective. SOC 2 coverage depends on the categories in scope. Each framework’s own text governs.

Industry considerations

The combinations we see.

SOC 2 for North America and ISO/IEC 27001 everywhere else, then PCI DSS once payments arrive.

SOC 2 readiness
Use cases

Programs we untangle.

SOC 2 + ISO

Two audits, one control set

Shared scope and shared evidence, with fieldwork aligned.

SOC 2 → PCI

Adding PCI DSS

Controls extended wherever PCI DSS is more prescriptive.

DORA

Bank clients passing down terms

Evidence for contract, incident and testing duties.

M&A

Merging two programs

Two control sets combined into one, without a coverage gap.

FAQs

Questions compliance teams ask.

Does an ISO/IEC 27001 certificate make us SOC 2 compliant?

No. Much of the evidence carries over, but SOC 2 is a separate attestation signed by a licensed CPA firm. We plan both so the work is done once.

Can one audit cover several frameworks?

Fieldwork can often be coordinated, but each framework produces its own report or certificate. We plan the calendar so the same evidence serves every event.

Which framework should we pursue first?

The one that unblocks revenue or meets a legal duty. Design your controls to the most prescriptive framework you will need within two years.

Do you sell a compliance platform?

No. We are tool-agnostic and work inside the systems you already use.

How is continuous assurance priced?

It is scoped to your frameworks and the depth of support you want. You receive a written proposal after the first conversation.

Speak with an expert

Stop answering the same question four ways.

Tell us which frameworks you answer to. A senior practitioner will come back with a sequencing plan and an estimate of the work you can stop duplicating.