Dallas, Texas · Technology consulting since 202135 services · 3 practices · 8 industries Technology in ActionPartnerships888-624-6613
Critical Infrastructure & Energy · Confidential client

Zero Trust Cloud Engineering for a Logistics Group

Flat networks segmented into verified zones, site by site, with no downtime in operations.

Client name withheld by agreement
Client
Freight and logistics group
Region
Dallas-Fort Worth
Year
2025 · Ongoing
Duration
32 weeks
Scope
120 sites · hybrid AWS and Azure
Practice
AI, Cloud & Digital Trust

The challenge

What was at stake.

A freight and logistics group ran 120 sites on flat networks, with hybrid workloads across AWS and Azure. A single compromised device at one depot could reach the whole business.

Operations run around the clock. Any security change that caused downtime would be reversed the next morning.

What we did

The approach, step by step.

  1. 01

    Zero trust architecture

    A target architecture built on verified identity, device health and least-privilege access to applications.

  2. 02

    Site-by-site segmentation

    Networks divided into verified zones in planned waves, with rollback ready for every change.

  3. 03

    Cloud connectivity rebuilt

    Private connectivity and policy enforcement between sites, AWS and Azure.

  4. 04

    Testing after every wave

    Network penetration tests confirmed each zone held before the next wave began.

Outcomes

What changed, in numbers.

120
sites in the segmentation program
0
hours of operational downtime
2
clouds under one access policy
100%
of completed waves verified by testing
They changed the foundations of our network while the trucks kept rolling.
Chief Technology Officer, client name withheld
Facing something similar?

Let’s talk about your version of this.

Share what you are up against. A senior practitioner who has delivered this kind of work will reply within one business day.