Dallas, Texas · Project controls and construction IT since 2021 Projects fail in the forecast, not the field CareersPartnersProgram Rates512-908-5223Data date
Controls Lab · 7 instruments, one schedule

Build the schedule. Then break it.

Schedule Studio is a working CPM engine in your browser: logic, calendars, progress, baselines and a live Gantt. Every other instrument runs on the same network, so a slip in one place shows up everywhere. Load a sample or import your own P6 file.

Instruments
7
Shared CPM network
1
Sample schedules
3
Bytes uploaded
0
01 · CPM engine

A CPM engine, not a picture of one.

Forward and backward pass, total and free float, FS, SS, FF and SF ties with lags, four calendars, constraints, actuals against a data date and baseline variance. Edit any cell and the network recalculates.

How to type logic, constraints and progress
  • Predecessors use P6 style text: A1020 is finish-to-start, A1020FS+2 adds a two-day lag, A1030SS, A1040FF-3 for a lead, A1050SF. Separate them with commas.
  • Durations and lags are working days on the activity calendar. Lags count on the successor calendar.
  • Progress: enter an actual start to start work, an actual finish to complete it, then set remaining duration. Move the data date and use Status to data date to apply the plan as progress.
  • Retained logic holds out-of-sequence work behind its open predecessors. Progress override lets it run from the data date.
  • Hard constraints (start or finish on or before, mandatory) can create negative float. Must finish by drives the late dates of open ends.
  • Undo with Ctrl+Z. The schedule is saved in this browser only.
On a real project

On live projects we run the same discipline in Primavera P6 every update: a fixed data date, retained logic, a frozen baseline and a written note on every change to the longest path.

Planning & Scheduling
02 · DCMA 14

Fourteen checks. No opinions.

The DCMA 14-point assessment runs on the Studio schedule by itself: logic, leads, lags, constraints, float, durations, dates, the critical path test, CPLI and BEI. Click a failed check to see the activities behind it.

Loading the shared schedule

    On a real project

    An independent review runs these checks and the ones software cannot, then tells you in writing what to fix before the baseline is approved.

    Independent Schedule Review
    03 · TIA

    Slip one task. Follow the damage.

    Delay an activity or insert a fragnet, tag who caused it, and watch float absorb it until it reaches the finish. Each event is its own window, so time, liquidated damages and revenue at risk add up the way a claim does.

    Loading the shared schedule

    Event type

    Impacted against unimpacted

    On a real project

    For a real claim we run time impact and windows analysis on the native files, the contemporaneous updates and the as-built record.

    Delay Analysis & Claims
    04 · Monte Carlo

    Is your date a plan or a hope?

    Thousands of runs of the real network, each with fresh durations and risk events and a full CPM pass. You get P50, P80 and P90 dates, the activities that drive the spread, and the ones hiding behind float.

    Loading the shared schedule

    Risk register
    Ranges per activity

    Blank cells use the percentages above. Durations in working days.

    What drives the spread

    Correlation of each activity with the finish date

    Criticality index

    Share of runs where the activity sat on the critical path
    On a real project

    On real schedules we run quantitative risk analysis on the P6 file itself and give boards a P80 date and a contingency they can defend.

    Schedule & Cost Risk Analysis
    05 · EVM

    Read the pulse before the budget report.

    Planned value from the baseline, earned value from progress, actual cost by month. SPI, CPI, earned schedule, three estimates at completion and the efficiency you would need to land on budget.

    Loading the shared schedule

    On a real project

    We build earned value into the schedule and cost system, so SPI, CPI and a forecast finish come out of every update without anyone retyping a spreadsheet.

    Project Controls & Earned Value
    06 · Calculator

    What one late day really costs.

    Revenue that has not started, interest on capital already spent, a site team still on the payroll and prices still rising. Set your numbers or pull the slip from the Studio, then see how little the liquidated damages cover.

    Every day late costs about$0

    On a real project

    On live projects we put this number at the top of every monthly report, so every acceleration decision is priced in real dollars.

    Cost Control & Forecasting
    07 · Recovery

    Recovery that moves the finish date.

    Crash, add a shift, fast-track or resequence, each tested against the network. See which options buy days, what each day costs, and why money spent off the critical path buys nothing.

    Loading the shared schedule

    Recovered schedule against today

    On a real project

    Our recovery plans test every option against the native schedule, price it, and show the owner the cheapest credible path back to the date.

    Recovery Planning

    Everything here runs in your browser. Files you import and numbers you type are never uploaded, and the working schedule is saved only on this device. The sample schedules are illustrative networks, not client projects.

    From the Lab to your project

    Run this on your real schedule.

    Lola Osoba, our founder, offers an independent review of your live schedule. Send the XER or MPP file and a senior project controls lead replies within one business day with what we see and what we would check first.