Advanced Industry · Data Centers

Megawatts late are megawatts lost.

Hyperscale campuses, liquid-cooled AI halls and edge programs. Our founder’s background is data center and infrastructure construction, so we know where this forecast fails first: power, long-lead gear and commissioning.

Projects shown
3
Their capital value
$2.58B
Markets we serve
16
Data Centers

Where the date is won or lost.

01

Utility power sets the finish

Substation work, utility energization and permanent power dates drive everything. If the utility slips, the hall is a very expensive empty room.

02

Long-lead gear owns the path

Switchgear, generators, transformers, UPS and chillers arrive on vendor dates. We carry factory witness tests and ship dates as activities, not footnotes.

03

Commissioning is not contingency

Level 1 to 5 commissioning, integrated systems testing and tenant acceptance take real weeks. Schedules that squeeze them fail at the very end.

Data Centers

What we schedule and control.

  1. 01

    Hyperscale campuses

    Multi-hall campuses with phased energization, shared central plants and each hall handed to a tenant on a contract date.

  2. 02

    AI and liquid-cooled halls

    High-density halls with coolant distribution units, direct-to-chip piping and rack densities that change after design is done.

  3. 03

    Edge and modular programs

    Many small sites on a repeat design, released, tracked and reported in one program schedule.

  4. 04

    Expansions on live campuses

    New halls beside operating ones, with every tie-in planned so live tenants and their SLAs never notice.

The services that matter most here.

Four of our 16 services carry most of the weight in this market.

Integrated Master SchedulingPlan

Utility, shell, electrical, mechanical, commissioning and fit-out in one schedule, from site award to ready for service.

Schedule & Cost Risk AnalysisPlan

A P80 ready-for-service date for each hall, with long-lead and utility risk modeled, so tenant commitments match reality.

Cost Control & ForecastingControl

Monthly forecasts that track equipment escalation, change orders and contingency drawdown hall by hall.

Construction Data & IntegrationConstruction IT

Schedule, procurement, cost and commissioning data joined in one source, so every hall reports the same way on every campus.

Straight answers to fair questions.

Can you track long-lead equipment in the schedule?

Yes. Submittal, release, factory witness test, shipping and set dates are activities with logic, so a late generator shows its effect on energization the same week.

We are building the same hall design on several campuses. How is that priced?

That is what Program Rates are for. Later halls reuse the logic library, WBS and reports at a highly discounted Program Rate.

Do you work for owners, developers or contractors?

All three. Owners and developers use us to hold the date. Contractors use us to build baselines and recovery schedules they can defend.

Data Centers

Show us the date you are protecting.

Send us the data centers project, the current schedule and the milestone everyone is watching. A senior project controls lead replies within one business day.