Dallas, Texas · Project controls and construction IT since 2021 Projects fail in the forecast, not the field CareersPartnersProgram Rates512-908-5223Data date
Partners · Work with us

Your client, our controls discipline.

You bring the project, the pursuit or the relationship. We bring senior schedulers, cost engineers, construction IT and a method that holds up in the owner meeting.

Partners

Who we partner with.

Six kinds of partnership, one standard of work. If yours is not listed, write anyway.

01

General contractors and CMs

Schedulers and cost engineers for a bid, a baseline or a crowded year. We work to your standards, inside your P6 database, without adding permanent headcount.

02

Design firms and engineers

Phasing logic, schedule narratives and cost checks that answer the owner’s first two questions before they are asked: when does it open, and what will it cost?

03

Law firms and claims consultants

As-planned vs as-built, windows analysis and time impact analysis, built from native files and a record that survives cross-examination.

04

Software and data partners

Teams building scheduling, cost, reporting or data tools who want working controls practitioners behind their pilots, integrations and product calls.

05

Teaming and joint ventures

Public pursuits that need a named controls partner on the org chart, from the proposal schedule to the first update after award.

06

Referral partners

Advisors, lenders and consultants who meet owners with a forecast nobody trusts. Introduce them, and we keep you informed.

What we bring

Controls you can sign your name beside.

  1. 01

    Senior people

    Schedulers and cost engineers who have defended dates in owner meetings and know a credible P6 schedule on sight.

  2. 02

    A tested method

    Critical path method, the DCMA 14-point assessment, AACE recommended practices and earned value, applied the same way on every schedule.

  3. 03

    Your tools, not ours

    We work in your Primavera P6, Microsoft Project, Power BI and Excel files. Your team learns no new platform to work with us.

  4. 04

    Program Rates on repeat work

    When a partnership brings the same kind of project again, the same team returns at a highly discounted Program Rate.

  5. 05

    Discretion

    We never name an owner or a partner’s project without written permission. Confidential stays confidential.

How to start

One short note starts it.

  1. 01

    Tell us who you are

    Your firm, the kind of partnership and the project or pursuit you have in mind.

  2. 02

    Talk to a senior lead

    A senior project controls lead replies within one business day and sets up a short call.

  3. 03

    Put it in writing

    A teaming agreement, a subconsultant agreement or simple referral terms, whichever fits.

conversations@evrardbanes.com

Partnership enquiry.

Fields marked are required.

This opens your own email app with everything filled in, addressed to conversations@evrardbanes.com. Nothing is stored on this site.

Have a project, not a partnership?

Tell us the date that cannot move.

Send us the project, the schedule and the date that matters. A senior project controls lead replies within one business day.