Multi-Tenant Colocation Data Center
A four-hall, 36 MW colocation data center where every hall was energized and handed to its tenant on the date in the lease.
- Owner
- Confidential
- Region
- U.S. Texas
- Market
- Data Centers
- Capital value
- $720M
- Size
- 4 data halls · 36 MW
- Delivery
- CM at-risk
- Duration
- 30 months
- Completed
- 2025
What was at stake.
Each data hall was sold to a different tenant with its own ready-for-service date and penalties. Generators, switchgear and chillers had lead times longer than the building itself. The schedule showed construction, but not the commissioning that decided handover.
How we controlled it.
What our schedulers and cost engineers did on this project.
Long leads first
Every generator, UPS, switchgear and chiller was tracked from order to set, with float shown against the hall it powered.
Commissioning levels
Level one to five commissioning was scheduled hall by hall, ending in integrated systems testing at full load.
Tenant milestones
Each lease date became a milestone, reported with float in every update so sales and construction saw the same thing.
Earned value
Earned value by hall showed the owner where money and time were going every month.
The result.
In a data center, a late hall is lost revenue for the owner and a broken promise to the tenant. We scheduled to the lease, not to the contractor.
Lola Osoba, Founder, EvrardBanes



More from Advanced Industry.
All Advanced Industry
Data Centers · In progressPowered Shell & Data Hall Fit-Out ProgramU.S. Midwest & Mountain · $1.65B · 34 months
Data Centers · 2024Data Center Substation & Utility InterconnectU.S. Southeast · $210M · 22 months
Semiconductor · In progress300 mm Wafer Fab Tool Install & HookupU.S. Texas · $890M · 30 months
Planning something like this?
Send us the project and the date that matters. A senior project controls lead replies within one business day. Building the same kind of project again? Ask about our highly discounted Program Rate.