The tool arrives. Is the room ready?
Fab support buildings, cleanroom expansions and advanced packaging. Tool move-in dates come from the production plan, and the room has to be certified before the first crate opens.
- Projects shown
- 2
- Their capital value
- $1.03B
- Markets we serve
- 16
Where the date is won or lost.
Tool install drives the building
Every tool has a move-in date, a hook-up scope and a qualification window. The building schedule exists to meet that sequence.
Certification takes its own time
Protocol, wipe-down, airflow balancing and particle counts are critical path work. Rushing them usually means doing them twice.
Utilities must lead
Ultrapure water, bulk and specialty gases, chemical delivery and exhaust must be commissioned before the first tool can run.
What we schedule and control.

- 01
Fab support and central utilities
UPW, bulk gas, chemical and power buildings that sit on the critical path for the whole fab.
- 02
Cleanroom expansions
New cleanroom space beside live production, with protocol stages and certification built into the logic.
- 03
Advanced packaging facilities
Fast packaging and test plants where tool install starts the moment each room certifies.
- 04
Tool install and hook-up
Tool-by-tool hook-up schedules linked to room turnover and to the owner’s production ramp.
The services that matter most here.
Four of our 16 services carry most of the weight in this market.
Building, utilities, tool install and qualification in one schedule, so the production ramp date traces to real work.
Detailed P6 logic for cleanroom protocol, certification and hook-up that field teams and owners both trust.
Risk models that include tool delivery and certification uncertainty, not just construction durations.
Controls staff inside the owner’s program team, using the owner’s tools and reporting cycle.
Projects we have controlled.
Owners stay confidential. Each project shows its region, capital value and status.
Straight answers to fair questions.
Can you schedule tool install with the building?
Yes. We tie tool move-in, hook-up and qualification to room turnover, so a late room shows its effect on production right away.
Do you work beside live production?
Yes. Expansions next to running fabs need tie-in windows and contamination control written into the plan, and we schedule both.
Can you support a multi-phase fab program?
Yes. Later phases reuse earlier logic and reports, which is where a Program Rate saves owners real money.

Show us the date you are protecting.
Send us the semiconductor project, the current schedule and the milestone everyone is watching. A senior project controls lead replies within one business day.