The plant earns at start of production.
EV battery plants, advanced manufacturing campuses and line installs. Start of production is a business date, with customers, hiring plans and incentives tied to it.
- Projects shown
- 2
- Their capital value
- $830M
- Markets we serve
- 16
Where the date is won or lost.
Production is the finish
The building is one step. Equipment setting, line commissioning and ramp-up decide when the plant starts to earn.
Scale multiplies small errors
On a plant of millions of square feet, thousands of workers and dozens of contractors share one site. Weak logic is exposed fast.
Incentives carry deadlines
Grants and tax incentives often depend on hiring and production dates. Missing them has a direct and visible cost.
What we schedule and control.

- 01
Battery and EV plants
Very large plants with dry rooms, formation areas and production lines handed over in phases.
- 02
Advanced manufacturing campuses
Large production buildings with robotics, automation and process utilities ready for a first production run.
- 03
Production line installs
New lines set, connected and commissioned inside existing plants without stopping the lines beside them.
- 04
Warehouse and distribution
High-bay and automated storage buildings whose readiness is tied to plant operations.
The services that matter most here.
Four of our 16 services carry most of the weight in this market.
Building, process equipment, utilities and ramp-up in one schedule that runs all the way to start of production.
Earned value across many contractors, with SPI and CPI by area, so problems surface while they are still small.
Schedulers and cost engineers on site for the duration, scaled up for the peak of the job and back down after.
Recovery schedules that protect the production date when an area or a supplier falls behind.
Projects we have controlled.
Owners stay confidential. Each project shows its region, capital value and status.
Straight answers to fair questions.
Can you schedule process equipment with the building?
Yes. Equipment procurement, setting, hook-up and commissioning sit in the same schedule, linked to the areas that must be ready first.
How do you control a site with many contractors?
With one WBS, one coding structure and an update cycle every contractor follows, checked before each update is accepted.
Does a second plant on the same design cost less to control?
Yes. The same team can run it at a highly discounted Program Rate, reusing the proven WBS, logic and reports.

Show us the date you are protecting.
Send us the manufacturing project, the current schedule and the milestone everyone is watching. A senior project controls lead replies within one business day.