Aerospace Component Assembly Plant

A 640,000 SF aerospace component plant with precision floors and overhead cranes, producing parts before the first aircraft deliveries.

Owner
Confidential
Region
U.S. Midwest & Mountain
Market
Manufacturing
Capital value
$310M
Size
640,000 SF
Delivery
Design-Build
Duration
28 months
Completed
2024
The challenge

What was at stake.

Machine foundations needed tight floor flatness and long curing. Customer qualification audits were fixed. The schedule had the audits as a final milestone with no logic tying them to equipment installation.

Schedule28 monthsCompleted 2024
202220232024
Start
2022
Finish
2024
Duration
28 mo
Our approach

How we controlled it.

What our schedulers and cost engineers did on this project.

01

Foundations first

Machine foundations were sequenced as their own critical chain, with curing and survey checks built in.

02

Qualification logic

Each customer audit was tied to the equipment, tooling and quality systems it would inspect.

03

Cost by area

Costs were tracked by production area, so the owner could see what each line truly cost.

04

Earned value

Earned value showed the owner real progress every month, not just percent complete.

Results

The result.

On dateFirst parts qualified
$310MCapital controlled
28Months, design to production
640K SFAssembly plant

The audit date was fixed by the customer. Everything else on the schedule had to earn its place in front of it.

Project controls lead, EvrardBanes
Manufacturing