Projects fail in the forecast first.
We measure what matters to keep your project on track. We stress-test the schedule, validate progress and flag the slip before it becomes a delay, so leadership decides on data it can defend.
- SPI
- 0.97
- CPI
- 1.03
- P80 buffer
- 21d
We
stress-test the logic,
measure the progress and
put the real date in front of leadership while it can still be changed.
- 20 yrs
- Founder delivering programs
- 2021
- Founded
- 16
- Services
- 16
- Markets served
We do not pour concrete, design buildings or sell software. We are the independent eyes on time and cost, working for owners, builders, lenders and counsel who need the truth early.
About EvrardBanesSixteen services. One version of the truth.
Plan, control, recover, and the construction IT that holds the numbers together. Call us before the first activity is drawn, or the week the dates stop holding.
- Planning & Scheduling
- Integrated Master Scheduling
- Cost Estimating & Budgeting
- Schedule & Cost Risk Analysis
- Project Controls & Earned Value
- Schedule Updates & Progress
- Cost Control & Forecasting
- Change & Contract Management
- Owner's Representative & PMO
- Embedded Controls Teams
- Controls Systems & P6 Administration
- Executive Reporting & Dashboards
- Construction Data & Integration
Price a late day before it happens.
Set the sliders to your project. Most teams have never seen this number written down. Then build and break a real CPM schedule in Schedule Studio.
- One week
- One month
- A 90-day slip
The record, not the brochure.
40 confidential projects across four sectors. The owners stay private. The dates, the logic and the outcomes do not.
Regional Medical Center Replacement HospitalA whole hospital moves on one day. Every system, every bed and every patient transfer points at that date.
Deep Tunnel Stormwater StorageFive miles of tunnel, two hundred feet down, built so a city stops flooding when it rains.
Multi-Tenant Colocation Data CenterTenants signed for megawatts on dates. Every hall was energized and handed over on the day it was sold.
Powered Shell & Data Hall Fit-Out ProgramSix buildings, one rhythm. Each data hall comes online faster than the one before it.
Managed Express Lanes CorridorTwenty-two miles of new lanes beside traffic that never stops. Every traffic switch is planned to the night.
Retractable Roof BallparkOpening day is printed on the tickets. A moving roof and forty-two thousand seats are being built backward from it.
Onshore Wind Farm RepoweringEighty-six turbines rebuilt to catch more wind. Tax credit dates were met with weeks to spare.
345 kV Transmission Line & SubstationsOne hundred forty miles of steel and wire, carrying power to the data centers and towns that were waiting for it.
The second data hall should cost less.
The next data hall, the next substation, another school in the same bond program. The WBS, logic library, cost codes, risk register and report templates already exist and already work. The same team returns at a highly discounted Program Rate, so you pay for the setup once.
Sixteen markets where a day has a price.
Buildings, advanced industry, infrastructure and energy. Different trades, the same question: is the finish date real?
Lola OsobaFounder · 20 years delivering complex programsI founded EvrardBanes as a dedicated Project Controls firm because most projects don’t fail in the field. They fail in the forecast.
Read the forecast before the field does.

Find the slip while it is small.
Send the schedule, the budget and the date your board is counting on. A senior project controls lead replies within one business day.


