Dallas, Texas · Project controls and construction IT since 2021 Projects fail in the forecast, not the field CareersPartnersProgram Rates512-908-5223Data date
Commercial & Mixed-Use · U.S. Southeast

Urban Multifamily Residential Tower

A 38-story residential tower with 410 units, delivered floor by floor on a steady cycle and leased up on schedule.

Owner
Confidential
Region
U.S. Southeast
Market
Commercial & Mixed-Use
Capital value
$260M
Size
38 stories · 410 units
Delivery
CM at-risk
Duration
30 months
Completed
2023
The challenge

What was at stake.

The lender's draw schedule and the leasing plan depended on a fixed floor cycle. Early slab cycles slipped, and the schedule hid it with a compressed finish phase nobody believed.

Schedule30 monthsCompleted 2023
202120222023
Start
2021
Finish
2023
Duration
30 mo
Our approach

How we controlled it.

What our schedulers and cost engineers did on this project.

01

Floor cycle measured

We tracked the real slab cycle floor by floor and showed what it meant for the finish date.

02

Recovery plan

A recovery plan with a second finishing crew brought the tower back to a believable date.

03

Lender reporting

Draw requests were checked against earned value, so the lender paid for work that was really done.

04

Turnover by floor

Units turned over in stacks, so leasing could start before the top floors were done.

Results

The result.

On dateFirst residents moved in
$260MCapital controlled
30Months, ground to last unit
410Units delivered

A tower is a rhythm. When the rhythm slips, you see it in the slabs months before you see it in the finish date.

Senior scheduler, EvrardBanes
Commercial & Mixed-Use

Planning something like this?

Send us the project and the date that matters. A senior project controls lead replies within one business day. Building the same kind of project again? Ask about our highly discounted Program Rate.